COMPACTION TESTING
Mudjacking uses a grout-based material, fused with cement. The process requires a 1" diameter hole, which is drilled through the slab, which the grout is then hydraulically pumped under the slab, resulting in the voids filling in, causing the slab to be lifted. The material for this process weighs approximately 100 lbs per cubic foot